Technical Case Study – Medical Ventilator
Customer Challenge A manufacturer of medical devices had plans to design a new anaesthesia machine used to ventilate patients with endotracheal tubes or supraglottic airways
By Admin|2023-02-21T09:23:58+00:00February 21st, 2023|Categories: Vendor Managed Inventory (VMI) and Technical Case Studies|
Customer Challenge A manufacturer of medical devices had plans to design a new anaesthesia machine used to ventilate patients with endotracheal tubes or supraglottic airways
By tfc_admin|2021-06-01T10:46:41+01:00April 30th, 2021|Categories: Vendor Managed Inventory (VMI) and Technical Case Studies, VMI|
Customer Challenge Despite having set a goal to replace a traditional in-house stores and withdrawal facility with a Vendor Management Inventory (VMI) based system, the
By tfc_admin|2022-02-16T11:12:20+00:00April 30th, 2021|Categories: Technical, Vendor Managed Inventory (VMI) and Technical Case Studies|
Aesthetics and practicality were combined when Aston Microphones specified a bespoke design of our Smalley Crest-to-Crest® type Wave Spring during the development of their Origin
By tfc_admin|2021-07-05T22:40:21+01:00April 30th, 2021|Categories: Vendor Managed Inventory (VMI) and Technical Case Studies, VMI|
Customer Challenge The successful growth from a small to a medium-sized manufacturer brought many additional logistics headaches for the purchasing department, particularly in the procurement
By tfc_admin|2021-07-05T22:39:51+01:00April 30th, 2021|Categories: Technical, Vendor Managed Inventory (VMI) and Technical Case Studies|
Customer Challenge Problems occurred on a major office block construction site when it was discovered not all the anchor points for the curtain walling fixings
By tfc_admin|2021-06-01T10:48:48+01:00April 27th, 2021|Categories: Technical, Vendor Managed Inventory (VMI) and Technical Case Studies|
Customer Challenge A leading manufacturer of sub-sea isolation valves planned to install upper and lower completions in a challenging deep-water environment. An isolation barrier valve
By tfc_admin|2022-02-16T11:09:40+00:00April 27th, 2021|Categories: Technical, Vendor Managed Inventory (VMI) and Technical Case Studies|
Customer Challenge The manufacturer of miniature robotic systems was faced with a problem when trying to introduce pre-loading of some miniature bearings in an exoskeleton
By tfc_admin|2021-06-01T10:51:08+01:00April 27th, 2021|Categories: Technical, Vendor Managed Inventory (VMI) and Technical Case Studies|
Customer Challenge The world of motorsport presents designers with some specific challenges and when a leading manufacturer of specialist gear technology was faced with circlip
By tfc_admin|2021-06-01T10:51:28+01:00November 19th, 2019|Categories: VMI|
Customer Challenge As a successful British manufacturer for over 30 years, supplying power and technology solutions into the fast-moving commercial office furniture environment, the management