Customer Challenge
Problems occurred on a major office block construction site when it was discovered not all the anchor points for the curtain walling fixings were in alignment due to hidden re-bars within the concrete plinth on which the walling was positioned.
TFC Solution
TFC Alignment Washers were recommended since they provided a fast low-cost means of adjusting the position of the bolted connection. By simply re-drilling the anchoring hole away from the re-bars, drilling an oversized hole in the fixing brackets, and utilising the appropriately sized alignment washer, all the corresponding fixing points were now aligned. Once all the fixings were tightened to the correct specification an approved resin was injected into the bolted assemblies to provide a permanent weatherproof and fireproof joint.
Customer Outcome
Prior to using Alignment Washers, the solution to misalignment problems was proving inordinate with an average cost of over £12,000 per day in downtime. Other methodology was expensive, slow and required a high degree of site expertise but, the TFC solution required minimal expertise and installation was simple and foolproof.
Customer Challenge
Problems occurred on a major office block construction site when it was discovered not all the anchor points for the curtain walling fixings were in alignment due to hidden re-bars within the concrete plinth on which the walling was positioned.
TFC Solution
TFC Alignment Washers were recommended since they provided a fast low-cost means of adjusting the position of the bolted connection. By simply re-drilling the anchoring hole away from the re-bars, drilling an oversized hole in the fixing brackets, and utilising the appropriately sized alignment washer, all the corresponding fixing points were now aligned. Once all the fixings were tightened to the correct specification an approved resin was injected into the bolted assemblies to provide a permanent weatherproof and fireproof joint.
Customer Outcome
Prior to using Alignment Washers, the solution to misalignment problems was proving inordinate with an average cost of over £12,000 per day in downtime. Other methodology was expensive, slow and required a high degree of site expertise but, the TFC solution required minimal expertise and installation was simple and foolproof.